(영문) 대전지방법원 2016.07.21 2015구합101053
벌점부과처분 취소
Text

1. On February 2, 2015, the Plaintiff Co., Ltd., which issued notice of confirmation of imposition of penalty points to the Plaintiffs on February 2, 2015: penalty points 1.

Reasons

- D. The construction works are ordered to be conducted on 13 occasions by submitting a quality control plan within 60 days from the date of the contract, and the supervisor shall submit a quality control plan within 7 days from the date of the examination to the Corporation, along with opinions on the performance of the quality control plan, and submit a quality control plan within 31 days after the due date of the construction contract (91 days after the due date of the construction contract), but the construction works are not prepared to be supplemented and returned by the supervisor (1 December 30, 13), despite the fact that the deadline for submission was 31 days after the due date of the construction contract (14 days after the due date of the construction contract), and the construction works are not prepared and submitted to the Corporation without submitting a quality control plan, such as supplementation and review of the quality control plan, without submitting a quality control plan after the due date of the construction works (14.22.5 days after the due date of the construction works), and the construction works are not prepared and returned to the Corporation without submitting a quality control instruction and supervision plan; - The construction works are not prepared and returned after the due date of the construction works;

arrow