(영문) 대전지방법원 서산지원 2015.12.17 2015고정231
무고
Text

The defendant shall be innocent.

Reasons

On January 6, 2015, the Defendant reported to the head of the construction site of a new building located in Chungcheongnam-gun, Chungcheongnam-gun, Chungcheongnam-gun, the Defendant reported to the assistant E belonging to the Seosan Police Station D Boxes called, “I see the F, etc., the head of the construction site of the said construction site, and “I sees things by people without permission.”

However, in fact, the above F returned the leased construction materials to G, the owner of the above construction materials, as the site manager of the above construction site, and the Defendant was well aware of this fact.

As a result, the defendant was arrested by F with the aim of having F punished criminal punishment.

Judgment

1. The defendant's argument is that the defendant was contacted at the construction site of a new building where the construction was interrupted, reported to the police, reported to the police, and requested the police officer to leave the site along with his wife, and that F was carrying an article at that place, and requested the police officer to investigate the article, and that F was carrying out construction materials leased from G, and that F did not constitute larceny in such a case and that F was allowed to carry out temporary materials and that F did not report false facts to the police officer.

2. Comprehensively taking account of the following circumstances acknowledged by the records and arguments in the instant case, it is difficult to recognize the fact that the Defendant reported false facts to an investigative agency, solely with the evidence submitted by the prosecutor, and it is difficult to recognize that the Defendant had an intention to make a false accusation.

Around August 2014, the Defendant contracted the construction of a new building for the land of Tae-gun, Chungcheongnam-gun, Chungcheongnam-gun to H, and H appointed F as the site director and had him/her carry out the said construction.

The Newly constructed Corporation.