(영문) 수원지방법원안양지원 2020.05.14 2019가단109382
양수금
Text

1. All of the plaintiffs' claims are dismissed.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

(2) On June 20, 2018, the construction of multi-family houses with approximately 80% of the size of four stories above the ground of 171.9 square meters in the Gu K K (hereinafter “instant building”) was executed with respect to the instant construction work (hereinafter “instant construction”), and the remainder of the construction cost is KRW 440,00,000, and the construction period is approximately four months (presumed from August 1, 2018 to November 30, 2018).

In accordance with the detailed statement of the settlement of the additional construction cost submitted, I agree to faithfully pay the additional construction cost and the unpaid construction cost, and agree to implement the promise to pay the additional construction cost and the unpaid construction cost.

Provided, That the maintenance and repair work for the short of L size which has already occurred shall be completed without additional construction costs, and the construction of stone and the installation of stone for the short water of the first floor shall be completed without compensation.

* It is necessary to deduct the construction cost of KRW 440,00 from August 13, 2018 to January 11, 2019, additional construction cost of KRW 440,00,00 for the construction cost of the original construction contract under the design drawings, other than the design drawings, executed by the construction work before completion inspection conducted from August 13, 2018 = 67,244,000 - KRW 58,094,00 for waste disposal, site rearrangement, unclaimed cleaning, construction completion, and wooden wage of KRW 13,00,00 for KRW 5,00 for additional construction cost of KRW 13,00,00 for KRW 50,00 for the construction cost of the construction site, and the remaining construction cost of KRW 105,00 for the construction cost of the construction site, KRW 105,00 for the construction cost of the construction site, KRW 16,005,00 for the construction site manager.

Attachment to the proviso of the letter of this case

3. The firms involved in the unsatisfying process parts shall complete all unsatisfy works not later than January 31.

shall not be completed by the due date.