(영문) 광주고등법원(제주) 2020.12.23 2019나10912
손해배상(기)
Text

1. Of the part concerning the principal lawsuit in the judgment of the court of first instance, the Defendant (Counterclaim Plaintiff) that exceeds the following amount ordered to pay.

Reasons

(b)it is possible to construct a building report only without permission and to extend the total floor area of less than 85 square meters only by a building report;

The name of the construction project: A.L.C. Panel Construction Works : 30 square meters: the total construction cost of KRW 180,000,000 from March 21, 2016 to June 30, 2016 (it may vary depending on circumstances): the method of paying the construction cost of KRW 180,000,000 - the first down payment: 100,000,000 - the second intermediate payment, and the third balance: Other matters to be paid after consultation - the owner and the contractor shall implement the contract in good faith in cooperation.

- The date of the payment of the cost of construction can be changed depending on the work process (payment with the owner and the contractor) - The total cost of construction can be settled in cash - the owner and the contractor may agree on an equal footing for matters not provided for in this contract.

- We guarantee A/S for the repair of defects of the house from June 30, 2016 to June 30, 2018.

* Matters of separate special agreement by inserting one copy of each special agreement

1. Indoor finishing of a paint;

2. Construction up to the extended management dong of the building - Construction of floor boiler pipes - lifelong water wanting to be suitable for the space (management dong water consultation);

3. Main installation;

4. Toilets open door;

5. Seashores and windows;

6. Three-yearly fishing shall be constructed upon extension after completion of construction;

7. Consultation on a glass screen between toilets and showers;

8. Installation of boiler respective control units of less than two million won, and bearing of the owner of the building when additional costs are incurred;

12. Construction cost of electricity, water supply, sewage facilities separate estimate 13. Construction cost of fences, etc., 14. Execution of mutual commitments 14. Work cost of fences, etc., showers, showers, screenes, changeers, and outdoor lamps, etc., 15. Execution at the time of purchase of another project owner;

B. On April 7, 2016, the Plaintiff’s building area and total floor area are 79.

arrow