Text
1. The Defendant: (a) KRW 390,00,151 to Plaintiff A; and (b) KRW 5,00,000 to Plaintiff B; and (c) from May 11, 2012 to May 2016 to each of the said money.
Reasons
1. Facts of recognition;
A. The Defendant, as a juristic person engaged in housing construction projects and civil engineering and construction works, etc., performed D Corporation (hereinafter “instant construction”) by being awarded a contract from the non-party owner in the B-dong, Jeonnam-do (hereinafter “instant construction”). The Defendant subcontracted molds, equipment, system construction, etc. during the instant construction work to the T-dong Co., Ltd.
B. The Plaintiff A entered into an employment contract with Samdae Construction Co., Ltd. and engaged in the system work from May 4, 2012 to the construction site of this case.
C. At around 17:20 on May 11, 2012, Plaintiff A performed the work of loading and unloading the hole that the F under E’s affiliated entity in the upper part of the 3rd floor mechanical room slve system Dongbane unit of the instant construction site in the instant construction site in a common square hole (Tube, system francing the charging line on the upper part of the ground water and tanking the underground water below the lower part of the ground water. At the instant construction site, Plaintiff A used 3 meters in length and 5 km in weight).
At the time, the plaintiff A was involved in an accident that the center of the hole was destroyed by a system of about 6.5 meters at a height of 6.5 meters among the materials being sealed by F in order to meet the direction of loading and unloading on the hole.
E. As a result of the instant accident, Plaintiff A suffered full damage to spine, and full damage to the cryp of the cryp of the cryp of the cryp of the cryp of the cryp of the cryp.
F. At the time of the instant accident, there was no safety launch plate, crash prevention network, safety distress, and safety belt to be used by the Plaintiff A at the time of the instant accident.
G. The plaintiff B is the father of the plaintiff A.
[Ground of recognition] Facts without dispute, Gap evidence Nos. 1 through 4, Eul evidence Nos. 4 through 17 and images (including paper numbers, hereinafter the same shall apply), witness G, H and F testimony, fact-finding results with respect to Korea Labor Welfare Corporation, and arguments.