(영문) 서울고등법원 2015.08.18 2014나33750
공사대금
Text

1. The plaintiff's appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

Purport of claim and appeal

The first instance court.

Reasons

1. Basic facts

A. The Plaintiff is a person operating a personal business entity called “C,” and the Defendant is a company with the purpose of reinforced concrete business, civil engineering business, soil business, etc.

B. The Seoul Regional Land Management Office ordered the “D Road Expansion Works” (hereinafter “instant construction”) by designating the Sejong Construction Co., Ltd. as the contractor, and the Sejong Construction Co., Ltd subcontracted the instant construction to the Defendant.

Section 1 (Purpose) In carrying out D Road Expansion Works, this Agreement shall be prepared in order to complete the construction work in an original manner on the basis of mutual trust between the two parties in the course of the execution of the D Road Expansion Works by the E representative director of B (hereinafter referred to as “A”) and C representative director A (hereinafter referred to as “B”).

Article 2 (Details of Projects)

1. Construction name: D road expansion works;

2. Order place: Seoul Regional Land Management Office;

3. Recipients: A corporation incorporated to construct tax sources.

4. Sub-recipient: AB of the credit rating company.

5. Period of construction: Article 3 (Management of Works) of all the terms and conditions of the relevant construction contract on February 6, 2012 on the date of commencement/construction: February 2, 2012.

1. “B” has to complete all of the above works under its responsibility.

2. “A” and “B” shall be entered into with respect to the above construction, and the contract amount shall be 95.65% of the supply value of KRW 4.65 billion (in comparison with the contract amount: value added tax of KRW 4.4 billion) shall be the settlement key, and the increase after the design modification shall also be 95.65% of the supply value.

3.A “B” shall be performed in good faith in the performance of the construction work in accordance with the construction management, safety management, and quality control and the design documents and specifications.

4. The limits of duties and responsibilities to be performed by “B” are as follows, and the scope of duties and responsibilities to be performed by “B” shall be delegated to “B”.

- the work ordering person(s)(s)(s)(s)(s)(s)(s)(s)(s)(s)(s)(s)(s)(s)(ands)(s)(s)(s)(s)(s)(s)(s)(s)(