(영문) 의정부지방법원 2020.06.23 2020고단1380
산업안전보건법위반
Text

Defendant

A and B Co., Ltd. shall be punished by a fine of 2 million won, each of which shall be punished by a fine of 1 million won.

Reasons

Punishment of the crime

Defendant

A is a safety and health management manager performing the safety and health management of employees belonging to the F Field under the control of Company B.

Defendant

B Co., Ltd. is a corporation that was established for the purpose of construction business, etc. in the Gangwon-do Seocheon-gun G on July 20, 1992 and is a corporation owner who subcontracted two water supply and drainage works, and reinforced concrete works from C and E among the “F” ordered by Gangwon-do H.

Defendant

C Co., Ltd. is a corporation established on May 21, 2004 by the Seocheon-gun G of Gangwon-do for the purpose of construction business, etc., and is a corporation that performs the “F” ordered by Gangwon-do H jointly with E.

Defendant

D is a person in general charge of safety and health who takes charge of and manages safety and health affairs for workers and workers of contractors in the above-site contracted jointly by Co., Ltd. E and C at the site of “F” located in the iron group I in Gangwon-do.

Defendant

On May 16, 1979, Co., Ltd. is a corporate owner that performs the “F” ordered by H as a corporation established by the YJ of the Y-gu, Busan Metropolitan City on May 16, 1979, by being awarded a contract with C.

1. In order to prevent danger to workers due to the collapse of the ground, the collapse of structures, the falling of soil and rocks, etc., Defendant A’s business owner must remove earth and rocks at a safe slope and be in danger of falling, or install retaining walls and earth mounds, etc. However, even though the planned excavation depth specified in the K’s design and construction work site is 1.5 meters away from the above construction site’s construction site, telecommunications facilities and equipment excavated up to 1.7 meters in addition, Defendant A’s business owner does not install a storm hole, without considering the safety of the ground in question, with earth mounds specified in the design and construction work site on March 18, 2019, and with earth and sand collapsed.

arrow