Text
A defendant shall be punished by imprisonment for not less than eight months.
However, the execution of the above punishment shall be suspended for a period of two years from the date this judgment becomes final and conclusive.
Reasons
Punishment of the crime
"2017 Highest 5328"
1. On October 17, 2016, the Defendant would allow the victim C to perform stone construction works by requesting the head of the E On-Site team at the site of D Highway at the site of D Highway to cover the same time as tamping. The introduction cost of KRW 1,00,000,000,000,000,000 won at the site of D Highway.
The phrase “ makes a false statement.”
However, the defendant did not have the ability or intention to have the victim perform stone construction works.
The defendant deceivings the victim as above and received 1,000,000 won as a referral fee from the victim.
Accordingly, the defendant was given property by deceiving the victim.
2. On October 24, 2016, the Defendant sent the amount to the victim at a mutual influorial car page located in the Gyeonggi-si, Busan-si, “If there is 15gs of pine trees emitted from the dust construction site, at the time of sending the amount.”
The phrase “ makes a false statement.”
However, even if the defendant received the payment, he did not have any ability or intention to give pine trees.
The defendant deceivings the victim as above and received 3,740,000 won as the price for pine trees.
Accordingly, the defendant was given property by deceiving the victim.
3. On November 3, 2016, the Defendant is obliged to pay KRW 300,00 to the victim with the money to be used in the house, “on the face of the victim’s loaning KRW 300,000 to be urgently required.”
The phrase “ makes a false statement.”
However, the defendant did not have any ability or intent to pay money to the victim.
The defendant deceivings the victim as above and was remitted 300,000 won as the borrowed money from the victim.
Accordingly, the defendant was given property by deceiving the victim.
4. On January 2017, the Defendant tried to request construction business operators to pay KRW 11,465,00 for construction cost of scke at the construction site of the F Bridge lower part of the construction site of the F Bridge, which is the construction site of the D-D Highway construction site, which is being constructed at the construction site of the contractor E, and the victim “b.”