Text
Defendant
A Imprisonment for six months, Defendant B shall be punished by a fine of KRW 700,000,00,000.
However, the defendant A.
Reasons
Punishment of the crime
[20 high group 1702] Defendant B Co., Ltd. (hereinafter “Defendant Company”) is a corporation established on December 27, 200 with its head office in Jongno-gu Seoul Metropolitan Government for the purpose of construction business, etc., and is a business owner who subcontracted “E reconstruction work” D from the E Housing Reconstruction Improvement Project Association to KRW 145,895,003,521 and performs the work from June 15, 2018 to January 15, 2021. Defendant A is a field manager of the Defendant Company, who is responsible for the safety and health of his/her employees.
1. Defendant A
A. Although a business owner needs to take safety measures, such as attaching products, materials, and members so that they do not go beyond, the Defendant did not take measures to prevent the destruction of the first floor of the construction site from July 29, 2019 to July 31, 2019.
B. In a case where a safety distress is installed between workers in order to prevent a crash, etc., the business owner is required to form upper railer, middle railer, end railer, and rail pole. However, from July 29, 2019 to July 31, 2019, the Defendant did not install the end plate between the safety distress in the non-meter of the Gryrea section G at the construction site.
C. Although a business owner has installed lighting or lighting fixtures of at least 75 lux on the passage so that workers can safely pass, the Defendant did not install lighting fixtures at least 75 lux in the Hdong stairs at the construction site from July 29, 2019 to July 31, 2019.
Although the business owner should install safety risks on the open side of stairs with a height of not less than 1m, the Defendant did not install safety risks on the side of the stairs open to the first floor from July 29, 2019 to July 31, 2019 at the construction site.
(e) Where a business owner engages in the work of using vehicle-based construction machinery, he/she shall conduct a prior investigation into the relevant work, the topography, ground level, ground level, etc. of the relevant work site and work in accordance with the relevant plan to prevent any danger to workers;