(영문) 수원지방법원 2013.08.28 2013고정1614
산업안전보건법위반
Text

Defendant shall be punished by a fine of KRW 1,000,000.

If the defendant does not pay the above fine, 50,000 won.

Reasons

Punishment of the crime

B Co., Ltd., from September 11, 201, employs 250 full-time workers from September 11, 201 to perform the “D Corporation” at KRW 80,039,482,00 of the construction cost in Young-gu, Suwon-si.

The defendant is the chief of the building department of the company B, who is responsible for the safety and health of employees belonging to the above site.

The business owner shall take measures necessary for the prevention of danger in the places where workers might fall down at work, material objects might fall or come off, and other places where there might be danger due to natural disasters in the course of work, and shall take measures necessary for the prevention of danger by electricity, heat or other energy.

The Defendant, around November 21, 2012, at the site of the “D Corporation” as above, at the site of the Defendant.

1. In the event that material objects are removed or are likely to fall due to work, the business owner has to install a protection line, etc., despite the fact that the Defendant did not install a protection line on the upper part of the road surface of the two main entrances of the above construction site;

2. Although the business owner has to install a safety distance on the open side of the stairs the height of which is not less than 1 meter, the Defendant did not install a safety distance from the outside of the stairs the 5th floor to the 2nd floor at the above construction site;

3. Despite the fact that safety distress, fences, vertical fall-off net, or covers are built in sufficient strengths at places where workers might fall down, as the end or opening part of the work launch board and passage, the business owner has not installed safety distress at the opening part of the work launch board (TP floor) on the front part of the outside non-sturst project launch board (TP floor) of the first and the second floor of the second floor in the construction site, despite the fact that the safety distress, fences, vertical fall-off net, or cover, etc. are not built in the construction site:

4. The business owner shall have the electric lights or temporary lights connected to the mobile wires for temporary use;