(영문) 대구지방법원 2019.06.12 2019구합42
전기사업불허가처분취소
Text

1. On July 20, 2018, the Defendant’s disposition of non-permission to operate the electric utility to the Plaintiffs is revoked.

2. The costs of lawsuit shall be.

Reasons

1. Details of the disposition;

A. On February 5, 2018, the Plaintiffs filed an application for an electricity business license with a view to installing solar power generation facilities in the 149,688 square meters of a forest located in Chungcheongnam-gun, Chungcheongnam-do. However, on April 10, 2018, the Defendant rejected each of the said applications on the grounds that “the size of a project site exceeds the size of the development permit, and it is impossible to engage in development activities because the size of the project site exceeds the size of the development permit, and that there is concerns over the destruction of green area reduction, environmental pollution, ecosystem damage, etc. pursuant to the Ministry of Land, Infrastructure and Transport Directive 3-2-4.”

B. On May 17, 2018, the Plaintiffs filed an application with the Defendant for an electricity business license to install solar power generation facilities, as shown below, on the instant application site (hereinafter collectively referred to as “instant application site”) on the said O and P forest land of 5,346 square meters, Qu orchard of Q, 17,931 square meters (hereinafter collectively referred to as “instant application site”).

The Plaintiff (A Q Q, S 4,541 BS 29,332 BS 297.92 CW 19,445 "D T U, S, V 10,80" 9,140 "FF 16,769 " HH 10,420 " HH 10,420 " I Q 10,420 " I, S 8,337, 498, size of power plant (kW), capacity of power generation (496 BS 29,3297.92 CW 19,444, 434, 434, 434, 478, 788, 97, 298, 209, 302, 30, 30, 405, 45, 297, 97, 97, 97, 97, 200

In addition, the installation of solar power generation facilities in forests and fields consisting of the green axiss, environmental pollution, destruction of ecosystem and damage and natural forests does not comply with the purpose of the National Land Planning and Utilization Act (hereinafter “National Land Planning Act”), and in particular, it is impossible to install solar power generation facilities by designating the Z of Cheongong-gun.

The grounds for disposition against A, D, E, I, K, L, M, and N - The above Q is on national highways.