(영문) 춘천지방법원 강릉지원 2018.10.11 2018구합30069
재검토 통보처분 취소 청구의 소
Text

1. The instant lawsuit shall be dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is the owner of each piece of land with a lot of 293m2 and a parking lot of 454m2 and a lot of 454m2 (hereinafter “instant site”).

B. On July 28, 2017, the Plaintiff filed an application for joint deliberation on a construction plan with respect to the construction of a neighborhood living facility and an urban residential housing (126 households) with a size of 4 stories below ground, 15 stories above ground, total floor area of 9,033.7 square meters on the instant site to the Defendant.

C. On August 7, 2017 and August 21, 2017, the Defendant issued a supplementary notice to the Plaintiff regarding the application for deliberation. Accordingly, the Plaintiff prepared supplementary documents and submitted them to the Defendant.

On September 19, 2017, the Joint Committee (hereinafter referred to as the “Committee”) to which the Defendant belongs (hereinafter referred to as the “Committee”) held a deliberation and rejected the deliberation for the following reasons. On September 25, 2017, the Defendant notified the Plaintiff of the results of the deliberation.

1. Parking lot - shortage of parking space (high possibility of causing an external parking accident) - shortage of mechanical parking management plans - the security of access road traffic safety and the establishment of a traffic plan in detail for the flat intersection; - the number of parking spaces for the disabled shall be expanded to 4% of the total number by referring to the Ordinance of high-level forces, referring to the basic plan for mobility disadvantaged persons; - the establishment of action plan to ensure that the number of parking spaces for the disabled is not damaged - the need for parking spaces for waiting vehicles - the difficulty in using mechanical parking (2 string) for waiting vehicles is difficult to accommodate the demand of vehicles concentrated on commuting - the security of parking spaces for the atmosphere - the separation distance between traffic vehicles and parking lots - the legal review of the separation distance between intersections and parking access roads - the examination to make multi-story mechanical parking lots available for multi-story mechanical parking lots available in different colors (SUV) from the color

2. Fire-fighting related - Special escape stairs installation outlines (it is necessary to disperse on the left and right by the edge of the escape line) - necessity of parking space 12 meters in separation distance on the road 12 meters in the rear side;

3. The shortage of detailed plans for energy conservation - the pressing.