Text
1. The plaintiff (Counterclaim defendant) is the defendant (Counterclaim plaintiff)-appellant B's ground reinforced concrete structure B in Seongbuk-gu, Sungnam-si.
Reasons
1. Facts of recognition;
A. The five-story sales facilities for the 5-story reinforced concrete structure B in Seongbuk-gu, Sungnam-si (hereinafter “instant building”) are the 4th underground and the 5th underground floors, the 4th underground and the 5th underground floors are the 1st underground and the 1st underground floors are the 1st underground, the 1st underground and the 2nd underground floors are the 1st underground, the 1st underground, the 2nd underground and the 3th underground floors are the 4th underground sales facilities, the 4th underground and the 5th underground facilities.
B. The Defendant is a sectional owner of No. 1-104 A of the first floor of the instant building.
C. On July 10, 2014, Nonparty 2 Co., Ltd. (hereinafter “Nonindicted Co., Ltd.”) leased 23 stores (Nos. 104 through 126) of the instant building from one lux securities Co., Ltd. with one 24m2, one 24m2, one 7m2, one 7m2, one 6m2, one 7m2, one 7m2, one 7m2, one 7m2, one 7m2, one 7m2, one 6m2, one 7m2, one 7m2, one 7m2, one 7m2, one 14, one 141, one 14, and one 7m2, one 7m2, one 7m2 and one 6m2, one 6m2, one 14, one 14, and one 7m2, one 7m2, each of the above drawings connected to each of the above stores.
The Defendant’s building of this case against Nonparty Company as Suwon District Court Branch 2014Gadan28717 was the building of this case.