logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울고등법원 2014.12.19 2014나2013738
손해배상(기)
Text

1. Of the judgment of the court of first instance, the part against the Defendants exceeding the money ordered to be paid under the following subparagraphs shall be revoked, respectively.

Reasons

1. The following facts do not conflict between the parties, or can be acknowledged by taking into account the following facts: Gap evidence 1 to 3, Gap evidence 10, Gap evidence 11, Gap evidence 17, Gap evidence 18, Eul evidence 21-1 to 6, Eul evidence 21-2, Eul evidence 21-2, and Eul evidence 2, and the results of the physical appraisal commissioned to the head of the first instance court's third generation school's third generation school's third generation hospital's third generation hospital's third generation, and the results of the fact inquiry conducted to the Korea Meteorological Administration of this Court.

Defendant B is the owner of the 5th floor building of the Gangnam-gu Seoul Metropolitan Government DD reinforced concrete structure (hereinafter “instant building”), and Defendant C was a person who installed protruding-type signboards (hereinafter “instant signboard”) on the outer wall of the instant building while operating a singing room by leasing a part of the instant building and operating the instant building.

B. The building of this case is constructed on the outer wall at a certain interval of time in an externally protruding state, and is constructed in such a way that it connects the signboard to the above poppy V and sets up it in a width. Since the accident of this case after the accident of this case, the stoppy of the outer wall of the building of this case where the signboard of this case was affixed with the signboard of this case is not completely cut off.

C. The impact of typhoons on September 2, 2010 caused a wind to the extent of 14.0m high speed high speed high speed high speed and 21.6m high speed high speed high speed high speed high speed, based on the Seoul Weather Observation Station located in Jongno-gu Seoul, Jongno-gu, Seoul. In particular, around 6:00 a.m. on the same day, the strong wind of 27m high speed high speed high speed high speed high speed. This constitutes a situation in which the entire trees salking and wind is difficult to walk.

On September 2, 2010, the signboard of this case fell from the outer wall of the building of this case, and the plaintiff fells with its head on the signboard of this case which fell at around 07:35 on the same day.

(hereinafter referred to as the “instant accident”) and received medical treatment by being admitted to the emergency room of the Gangnam Synam Hospital.

The plaintiff has a string of the shoulder part at the time.

arrow