logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2020.09.23 2018가합28580
기타(금전)
Text

1. The Plaintiff (Counterclaim Defendant) paid KRW 56,743,872 to the Defendant (Counterclaim Plaintiff) and its related amount from November 15, 2018 to March 13, 2019.

Reasons

A principal lawsuit and counterclaim shall also be deemed a principal lawsuit and counterclaim.

1. Basic facts

A. The status of the parties is that the Plaintiff made bean by mixing it with water, so that the former bean is far more detailed than the latter in the middle part, and received it and made two parts. The Plaintiff is an enterprise that produces two parts of the specialized form of food machinery, and the Defendant is a company that manufactures and sells food machinery.

B. On August 30, 2017, the Plaintiff and the Defendant entered into and completed the instant contract: (a) manufactured and supplied the instant machinery H/W of the automation system H/W (hereinafter “the instant machinery”). The Plaintiff paid the Defendant the amount of KRW 199,570,000 to the Defendant as the price for the goods” (hereinafter “instant contract”) between the Defendant and the Defendant.

(2) The instant machines were concluded. (2) The instant machines are: ① water, bean automatic input and mixed device, ② automatic straw straw straws, ③ hot water tank, ④ bean oil racker, ④ bean oil racker and air racker tank, ⑤ straw racker and air racker tank, 6 strawer, 7 racker and quantitative pumps, 8 racker and racker, racker and racker, respectively, and production facilities that enable mass production of racker by continuous operation of each of the instant devices.

3) On September 20, 2017, the Plaintiff paid the Defendant KRW 19,570,00,00 in advance payment of KRW 116,358,00 on September 20, 201, and KRW 83,212,00 on December 29, 2017. On December 28, 2017, the Defendant supplied the instant machinery to the Plaintiff and issued a surety insurance policy and a written completion of construction. 4) As to the instant machinery from March 28, 2018, the Defendant changed the mixture facility replacement (the method in which the Congo was directly stored in the water), ② the installation of the bean water cooling cooling system, ③ the alteration of the mixture system, ④ the replacement of the packing system, ⑤ the replacement of the shock machine, and ⑤ the pest cooling equipment.

arrow