The Defendants jointly share KRW 151,961,965 with respect to the Plaintiff and 5% per annum from September 18, 2019 to September 24, 2020.
Reasons
Basic Facts
Article 1 subparag. 2 and subparag. 2-2 of the Fisheries Act and Article 2 subparag. 1 and subparag. 2 of the Farming Industry Development Act provide that “fisheries” and “fish business” are mixed with “fisheries damage investigation report related to the construction of the JY-gu, Suwon-gu” (Evidence 1) prepared by the International Research Institute around February 2019 by the Plaintiff’s permit number farming business operator. However, according to Article 1 subparag. 2 and subparag. 2-2 of the Fisheries Act and Article 2 subparag. 1 and subparag. 2 of the Farming Industry Development Act, the concept of fisheries and aquaculture business is distinct
F. From September 9, 201 to September 9, 2016, Plaintiff 1,64.3 square meters of land sea-water cultivating business, which is located in the place of validity cultivation and the total area of the fish plantation, and Plaintiff 1,64.3 square meters of 1,664.3 square meters from September 27, 2016 to September 8, 2021, Plaintiff 1, as indicated in the table, is engaged in the fish cultivating business (hereinafter “instant fish plantation”). The Plaintiff, as indicated in the table, is engaged in the fish cultivating business, “E” (hereinafter “instant fish plantation”).
On April 22, 2004, the project name and business registration number E at the place of business commencing the business of a mutual business entity, Plaintiff 2, Dasung-gun, Gosung-gun, Kim Sung-gun, entered into a contract with Defendant B on April 22, 200 for the construction of a thermal power plant: 1,040 M2 (area 912,00 square meters): The project cost for a thermal power plant (area 912 square meters): The location at KRW 3:6,73 billion: The construction period of Nririwon-gun, Gyeongsung-gun, Gyeongnam-gun: From September 2016 to April 202: 1: From October 22, 2015 to December 22, 2017 (around 2016 to December 22, 2017). The construction project owner entered into the instant construction project with Defendant B (hereinafter “Defendant J. 1/4, 2016”).
Defendant B’s investigation into blasting work and damage during the number of years 2018, approximately thirty times from January 25, 2018 to October 13, 2018.