(영문) 서울중앙지방법원 2013.12.18 2012가합57427
손해배상(기)
Text

1. Each principal claim against the Defendant (Counterclaim Plaintiff) B and Defendant C by the Plaintiff (Counterclaim Defendant) and the Defendant (Counterclaim Plaintiff) B.

Reasons

1. Basic facts

A. On June 10, 2010, the Plaintiff D, on behalf of the Plaintiff, entered into a contract with Defendant B to create housing site on behalf of the Plaintiff for the instant construction site (hereinafter “the instant construction contract”). As to the instant construction contract, the following construction contract has been entered into:

(2) The initial contract in this case (No. 71) - the total cost of the contract in this case (No. 71) - Other matters (excluding the land 500 square meters) - Other matters (G) are included in the land construction.

(2) The multiple works shall be borne by the landowner, including civil petitions, for construction works other than the currently constructed parts.

(3) The amount of construction works shall be 500 square meters.

(4) The period of construction shall be approximately three months after the exception period is granted.

(5) All of the stone festivals and construction works built as existing blasting stones shall be removed, and expenses shall be borne by B.

(2) The instant final contract (A No. 72) - The total cost: 260 million won - the down payment of KRW 200 million - the remainder of KRW 60 million - the payment date: The payment date includes the land (G) excluded from the instant land construction after the completion of construction.

(2) In drainage works, a landowner shall bear the costs of works other than the current part.

(3) The cost of construction shall be transferred by equity of the substitute land (500 square meters).

(4) The period of construction shall be approximately three months after the exception period is granted.

(5) Attached 1 – Construction cost shall be 500 square meters in lots and shall complete all construction works within the scope of the contract.

(2) An entry and entry, and an inner package shall be cement concrete.

(3) The entrance access road, including the entrance and exit road opening day, shall be visible, and a water pipe and drainage pipe in a complex shall be installed.

(4) A construction period, accident and civil petition shall be responsible for a construction beneficiary.

(5) After the change of beneficiary, the seller shall transfer the registration of the documents required by the buyer.