(영문) 청주지방법원 제천지원 2015.10.29 2015고단377
산업안전보건법위반
Text

Defendant

A A A The fine of KRW 7 million shall be imposed on Defendant B with a fine of KRW 3 million, and Defendant C shall be fined.

Reasons

Punishment of the crime

1. The Defendant Co., Ltd. is a corporation established for the purpose of installing a PC (Precte) in the second floor of the G Building in Gwangjin-gu Seoul Special Metropolitan City (the method of manufacturing the columns, beams, and sludge in a factory and then relocating them to the site and assembling them to the site by using concrete, steel bars, steel bars, etc.). The Defendant Co., Ltd. was a business owner who subcontracted the “PC assembly construction work” from C to 49,500,000 won.

In places, etc. where buildings, etc. are likely to collapse during work, a business owner shall take necessary measures to prevent hazards, such as checking whether persons were executed in accordance with design documents and whether construction works were executed in accordance with construction specifications, in order to prevent risks, such as collapse, electric failure, collapse, etc. due to load load load, etc.

Nevertheless, at around 15:00 on April 23, 2015, B, the Defendant’s on-site director, carried out construction works without confirming whether the construction process is in conformity with the design documents, at the site of “C short-term factory construction work” located in Chungcheongnam-gun H, Chungcheongnam-gun, Chungcheongnam-gun, and without confirming whether the construction process is in conformity with the design documents, and the columns (the middle part of the columns are fluored without concreteing in order to build and assemble beams and slabs that fall under the 1st floor and the 1st floor and the 2nd floor of the 2nd floor and did not take necessary measures to prevent danger.

2. Defendant B is a person in general charge of safety and health as a site manager of “PC assembly construction work” among the “C Fractional Factory Construction Work Corporation” of the Company A.

In places, etc. where structures, etc. are likely to collapse during work, a business owner shall have constructed them in accordance with design documents in order to prevent risks, such as collapse, electric failure, collapse, etc. due to the load load.