Text
1. All of the plaintiffs' claims are dismissed.
2. The costs of lawsuit are assessed against the plaintiffs.
Reasons
1. Basic facts
A. The plaintiffs are children of the network I and J. 1) The plaintiffs are the current status and the site of the plaintiffs' buildings and their ownership relationship with the plaintiffs. I, on June 23, 1978, 76 square meters in KJ, Dongdong-si, Dongdong-si, Do-si, Do-si, 1978, 42.98 square meters in the place of a business of a wooden tank and a branch of the ground, and 20.83 square meters in the place of a business of a wooden roof, a building attached thereto (hereinafter the above buildings referred to as "the building in this case"), and the land and buildings collectively are "each of the instant
On October 9, 2001, the Plaintiff acquired ownership after completing the registration of ownership transfer in its name, and on October 9, 2001, the Plaintiff A died.
9. 4. 4. The registration of transfer of ownership is completed in its name due to inheritance by division of consultation, and the plaintiff Eul, who was the plaintiff Eul's omission, purchased each of the real estate of this case from the plaintiff A on December 7, 2005, and completed each registration of transfer of ownership on December 21, 2005.
2) The instant building was located in the L market in the Tong-si, and the steel columns received a roof without the wall. The part connected with the pole’s hair is being used as a passage in the L market and is in use in the joint ownership of the Republic of Korea and Tong-si, Si-si, H ditch 122 square meters, and G road 240 square meters (hereinafter “the instant ditch and road”) owned by the Republic of Korea.
) Some of the real estate was invaded (each of the instant real estate is attached to the west of the ditch of this case).
On April 15, 2015, the area of five square meters, among H ditches in Dong-si, Dong-si, was divided into MM on April 15, 2015, and the Plaintiff B acquired the ownership of five square meters, and on December 2, 2016, merged the area into the area of 76 square meters in Dong-si, Dong-si, Dong-si, Dong-si, and increased into 81 square meters.
(3) On August 31, 2016, Plaintiff B completed the registration of destruction of the instant building, and completed registration of preservation of ownership on January 16, 2017, following the construction of the second floor building (the alteration registration of indication was completed due to the extension of the third floor on June 29, 2017).
B. A contract entered into between the Defendants and I, and the Defendants’ management 1 on the street store from around 191 to around 191.