logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울남부지방법원 2018.09.06 2017가합105716
공사대금
Text

1. The Defendant shall pay to the Plaintiff KRW 326,370,000 and the interest rate of KRW 15% per annum from January 26, 2017 to the day of full payment.

Reasons

1. Basic facts

A. The Plaintiff and the Defendant’s consolidated electronic security system construction contract number repair, repair, replacement, and replacement under the long-term repair plan for the replacement items, 48 Integrated Control Center (including relocation of security equipment) amounting to 149,60,600,000 2016 90,000,000 502 million chemical IP CCTV 2000,000 (Alyon CCTV) 2016 760,000,000 (Olyon CCTV) 2016 760,000,000 (LPR) - 50-1 stop period (LPR) - 2016 - 200,000,000 (Newly Inserted by Presidential Decree No. 17509, 700,000,000; Presidential Decree No. 17200, 200,000 apartment houses (hereinafter “Defendant apartment houses”)

On October 7, 2016, the head of the management office gave guidance to the occupant to adjust the long-term repair plan as follows. (2) As a result of examining the opinions of the occupant of the apartment from October 8, 2016 to October 30, 2016, 1,077 households, among the 1,983 households, were 54.3% of the total number of 1,983 households.

3) On October 31, 2016, the Defendant passed all the following agenda items with respect to the construction of an integrated electronic security system (hereinafter “instant construction”) with the purport of holding a council of occupants’ representatives on a October 31, 2016 and establishing an integrated control center, IP CCTV camera, storage server, operation server, number recognition parking breaker, streetphone, etc. (hereinafter “instant construction”). Based on the standard design specifications provided by the advisory company C, a business operator shall be selected and entered into a contract for technical advice and process management. A project operator shall be selected and entered into a contract. A proposal for public announcement of tender (including field explanatory note and accompanying documents) shall be adopted as the original design. The construction contract shall be adopted as the original design. A majority of the residents’ written consent to the coordination of the long-term repair plan (the total household 1983 households, written consent 1077 households) was confirmed, and the Defendant selected the lowest project operator on November 1, 2016, and conducted the project proposal on January 16, 2016.

5..

arrow