logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원논산지원 2016.01.07 2015가단1850
주위토지통행권확인
Text

1. Of [Attachment 47-50, 53-56, 58, and 47] [Attachment 4] among [Attachment 4] 1,96 square meters in Seosan-si, Seosan-si.

Reasons

Basic Facts

A. From the 1970s to 2002, the Plaintiff’s attached E cultivated crops by borrowing 14,645 square meters (hereinafter “the instant land”). From 2003 to 5 years, the Plaintiff entered into a loan agreement with the Republic of Korea on the land under the instant land, and entered into a loan agreement with the Republic of Korea on January 1, 2014 regarding the land under the instant land from January 1, 201 to December 31, 2018, respectively, with the term of lease from the Republic of Korea as “the term of lease from the Republic of Korea and December 31, 2018”.

B. The so-called “fluorial land” that does not adjoin the meritorious services of the Republic of Korea, and the Plaintiff, at present, installs a plastic house within the area of the destination of the instant case and cultivates her sonship at such place.

C. As seen in the Appendix 3, local highways located north, west, and east of the instant land are located adjacent to the instant land. D. As seen in the Appendix 3.

At present, from the point indicated in the annexed drawing No. 2 to the point indicated in the annexed drawing No. 2, from the annexed drawing No. 3 to the point indicated in the annexed drawing No. 2, from the annexed drawing No. 1 to the point indicated in the annexed drawing No. 1, the letter No. 1 to the one-lane 1 local highway in the Dong is opened, which is approximately 2.5 meters wide.

(hereinafter referred to as “instant passage”). E.

Of the passage roads of this case, the Section B-C is established on the G land at the time of Y, and the said G land is owned by H small land.

On the other hand, among the instant traffic paths, part of the portion A-B is set up on the land of 1,966 square meters in Seosan-si (hereinafter “instant land 1”) and D 1,269 square meters in Seosan-si (hereinafter “instant land 2”); and part of other parts are set up on the land of 1,356 square meters in Seosan-si, Seosan-si.

The precise location and size of section A-B among the traffic roads of this case shall be indicated in the attached Form 4.

The following shall be used as a passage to the section A-B above.

arrow