Text
The Defendant’s KRW 154,834,143 as well as the Plaintiff’s annual rate of KRW 5% from September 27, 2016 to August 11, 2017.
Reasons
Basic Facts
A. Status 1) The Plaintiff is the Industrial Accident Compensation Insurance Act (hereinafter “Industrial Accident Compensation Insurance Act”).
A) Based on the Ministry of Employment and Labor’s provision, the Defendant is a corporation entrusted with the industrial accident compensation insurance business by the Minister of Employment and Labor. The Defendant is the B P PPcar owned by A (hereinafter “instant vehicle”).
2) As to the automobile insurance contract (hereinafter “instant insurance contract”)
(2) C is an employee who belongs to the construction site of this case of construction concrete (hereinafter referred to as “construction concrete”)
C In its original operation of ready-mixed Vehicles, the individual entrepreneur, who is engaged in construction machinery contract and rental business, or the construction site of the instant construction concrete, carried out the business of transportation of ready-mixeds, etc. in accordance with the direction and supervision of the construction concrete. Since the special type of employment prescribed in Article 125 of the Industrial Accident Compensation Insurance Act, as the construction concrete was in the status of the insured for industrial accident compensation insurance covered by the construction site of this case, C is a worker belonging to the construction concrete.
B. (1) D) On October 3, 2013, 2013, at the site of the Do Do Do Do Do Do Do Do Do Do Do Do Do Do Do Do Do dong Do Do Do Do Do Do Do
2) While operating the instant vehicle at the point of view, an accident in which a head of a boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom
2) C was hospitalized from October 3, 2013 to April 25, 2016 due to the instant accident, resulting in injury, such as damage to the number of scams in the parallel, damage to the right-hand scams in the parallel of 5-6, damage to the escape of scams in the parallel of scams, and escape of scams in the parallel of scams in the parallel of 6-7.
(hereinafter referred to as “victim”) C.
Payment of industrial accident insurance benefits.