logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 전주지방법원 2014.03.11 2013가단22340
토사매립 및 경지정리대금
Text

1. The Defendant’s KRW 11,340,00 for the Plaintiff and KRW 5% per annum from July 10, 2013 to March 11, 2014.

Reasons

1. Basic facts

A. The former North Korea Development Corporation awarded a contract for construction of the public rental apartment of the Jeonju innovation city with the Geum Industrial Co., Ltd. (hereinafter “gold Industry”), and the gold industry subcontracted the construction of gold 15 block (hereinafter “the construction site of this case”) among the above construction works to C (hereinafter “C”).

B. C entered into a “contract for Transport of Earth and Stone” with the content that the Plaintiff wishes to transport earth and sand and to transport soil and sand for transporting earth and sand at the construction site of this case, and the Plaintiff agreed to pay KRW 6,000 per 25 tons truck to C at the time of removal of earth and sand.

C. From April 27, 2013 to May 3, 2013, the Plaintiff brought part of the earth and sand collected at the construction site of this case into the land D, E, and F owned by the Defendant, and buried and arranged earth and sand.

[Evidence] The descriptions and images of Gap evidence Nos. 1, 12, 16, 19, 20 (including paper numbers), Eul evidence Nos. 2, and the purpose of the whole pleadings and arguments

2. Upon receiving a request from G, who is the executive director of C and the general manager at the construction site of this case, to reclaim earth and sand on the land of this case owned by the Defendant, the Plaintiff alleged that the price for soil and sand transportation to G is KRW 35,000 per 15 tons of truck, but the cost of using heavy equipment, such as digging machines, etc. for land rearrangement, is stated separately.

Since then, the plaintiff explained the above contents to the defendant and the defendant, and the defendant is required to pay them as they are.

The plaintiff from April 27, 2013 to the same year

5. up to March 1, 200: (a) carried 746 earth and sand on the instant land owned by the Defendant with 15 tons truck; and (b) carried out drillings for 77 hours, 3 days, and 150,000 won per day and 400,000 won per day (only fuel charges), based on 8,000 won per day and 8,000 won per day.

arrow