Text
1. The Defendant shall pay to the Plaintiff KRW 66,85,585 and the interest rate of KRW 20% per annum from June 6, 2015 to the day of complete payment.
Reasons
1. Basic facts
A. On November 22, 2011, the Plaintiff was a corporation engaged in steel products and steel pipes, cutting, processing, and selling non-ferrous metal cutting, and entered into a mutually advantageous integrated construction company (formerly, Dongbu General Construction Co., Ltd.; hereinafter “beneficiary Construction”) with the following goods supply contract (hereinafter “instant contract”), and the Defendant jointly and severally guaranteed the instant contract within the scope of KRW 200,000,000.
Article 2 of the instant contract: All goods supplied or supplied at present or in the future by the Plaintiff shall be subject to this contract, and the specifications, quantity, delivery date, place of delivery, etc. of specific goods shall be determined through individual contracts, orders, etc. or other similar documents.
Article 4:Contract Amount of Contract shall be this hundred million won (Won 200,000,000).
(Provided, That Article 5 may increase at the time of mutual consultation. The term of the contract shall be three months from the date of the contract, and may be extended by mutual consultation between the plaintiff, construction, and the plaintiff.
Article 6:Paragraph 1: The price of goods shall, in principle, be paid in cash until January 31, 2012.
(Provided, That if the price of goods is not paid by the due date for payment under the proviso to paragraph (1), interest shall be paid in addition to 20% per annum in accordance with the plaintiff's internal revenue rules.
B. According to the instant contract, the Plaintiff supplied goods equivalent to KRW 255,946,119 in total from November 30, 201 to February 10, 2012 under the instant contract to Hycheon Construction, but the Hycheon Construction did not pay the price. Accordingly, the Plaintiff was paid the said KRW 255,946,119 in April 17, 2012 from Hycheon Construction until April 18, 2012. However, if this is delayed, a notarial deed was drafted to receive damages for delay calculated at the rate of 20% per annum.
C. However, Hycheon Construction shall pay the above money.