(영문) 서울서부지방법원 2015.11.11 2015가합33397
소유권이전등기
Text

1. The Plaintiff:

A. 1 Defendant B shall be as shown in Appendix 1.

2. As to each of the real property mentioned above, the defendant C shall be listed in annexed Form 1.

Reasons

1. Basic facts

A. The Plaintiff was established pursuant to the provisions of the Act on the Maintenance and Improvement of Urban Areas and Dwelling Conditions for Residents (hereinafter “Urban Areas and Dwelling Conditions for Residents”) to implement a housing reconstruction project (hereinafter “instant reconstruction project”) on the ground of land of Seodaemun-gu Seoul Seomun-gu, Seoul, Seoul, the Plaintiff was approved by the head of Seodaemun-gu on November 26, 2007, and completed the establishment registration at that time. F and G are attached Table 1 located within the instant reconstruction project district at the time of the establishment of the Plaintiff’s association;

2. A list of the same real estate(F) as described;

4. The owners of each of the real estate listed shall be members who have consented to the establishment of the Plaintiff’s association.

Defendant B is a member of F on May 21, 2013, and Defendant C is a member of G on December 20, 2012.

Defendant D’s Schedule 1

4. It is an occupant of the portion 31.68 square meters in the “A”, which connects each point of the attached Table 1, 2, 5, 6, and 1, among the real estate indicated in the attached Table 2.

B. The head of Seodaemun-gu approved and publicly notified the implementation of the instant reconstruction project on December 24, 2010, and F and G were applied for parcelling-out as determined by the Plaintiff from February 22, 201, the period for filing applications for parcelling-out as determined by the Plaintiff.

5. The period for application for parcelling-out to 5.

4. It was up to 15.

5. 5. The extension was extended until 5.

The application for parcelling-out was made.

C. The Plaintiff established a management and disposal plan based on the above application for parcelling-out, and applied for authorization therefor, and the head of Seodaemun-gu approved a management and disposal plan on August 14, 2012 and publicly notified it around that time.

On March 14, 2013, the plaintiff filed an application for parcelling-out with the approval for the implementation of the project from the head of Seodaemun-gu.

4.1. through 1.1.

5. 14. Determination of the application for parcelling-out by the end of 14. The application for parcelling-out shall be specified as "to be deemed as having been applied for parcelling-out in the above modified design deliberation on the basis of the application for parcelling-out on the basis of the application for parcelling-out at the time of the absence of an application for the change of a separate plan and the withdrawal of

arrow