logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2017.04.21 2016가합532582
손해배상(기)
Text

1. The plaintiff's claims against the defendants are all dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is a company that operates landscaping business, landscaping planting business, and facility installation business.

The Incorporated Foundation C (hereinafter referred to as the “Foundation”) is a foundation that aims at the creation, maintenance, and management of the Park Burial (hereinafter referred to as the “E”) located in Gyeonggi-si D (hereinafter referred to as the “E”) as a foundation.

Defendant Hyundai Construction Co., Ltd. (hereinafter referred to as “Defendant Hyundai Construction”) is a construction site of the “Bju-Uwon Highway” (hereinafter referred to as the “Bju Highway”)’s “Public-Private Partnership Project,” and Defendant B is a site manager of the G Tools affiliated with the Defendant Hyundai Construction (hereinafter referred to as the “instant Section”).

B. The instant foundation foundation, which entered into and provided a contract on earth and rocks, on June 25, 2014, shall use small amount of powders for excavation or theft, such as earth and rocks (such as earth and sand, winding rock, brick rock, and light rock) generated from the instant construction section to Defendant B on June 25, 2014, according to the construction work standard pactum pactum, civil engineering, construction, and machinery and equipment “the construction standard pactumumumum, published by the management agency in accordance with the Ministry of Land, Infrastructure and Transport No. 783,” ① some of the culumum cancer may be used, but it shall use a small amount of powders for excavation or theft, such as culumumumum, and culumumumumumum cancer, 2. It means that, however, it is inappropriate to use them for culumumumumumum, 3.m., malumumumumumumumumumumum cancer, etc.;

The provision of 100,000 to 120,000 cubic meters was requested.

In connection with the disposal of soil and stone at the construction site of the G Section, the Si Corporation shall enter into an agreement with the following:

- LA - Terms and Conditions of Agreement

1. The earth's quantity of sand shall be 40,00 cubic meters and blasting rock 80,000 cubic meters and earth's information sharing system.

arrow