(영문) 청주지방법원 2015.08.28 2014고단925
공문서변조등
Text

The sentence of sentence shall be suspended for the defendant.

Of the facts charged in the instant case, public documents are altered and altered.

Reasons

Punishment of the crime

The Defendant is a public official working in the construction department E, and a person who has been in charge of supervising the design, construction, etc. of theG "G" while working in the F waterworks project headquarters facilities from September 2008 to July 2012.

The F's Waterworks Business Headquarters received a review opinion on government-funded machinery and materials to the effect that "It is desirable to take measures to ensure that it can be supplied by the efficacy industry corporation with patent technology or the transferred business entity with the technology," and followed the review process of the supervision group and internal review of the main machinery and materials.

After that, on April 15, 2012, the Defendant: (a) proposed a review report on the purchase of major machinery and equipment in G (the field of civil engineering and machinery; hereinafter “Review report in this case”); and (b) obtained approval from the Director of the Water Supply and Waterworks Headquarters, who is the final decision-taking authority, after obtaining approval from the Director of the Department in charge of Public Works and Public Affairs.

However, unlike the contents of the review report of this case, the FF Water Supply Business Headquarters selects “Stock Co., Ltd.,” which is not the “FFE Industry Co., Ltd.,” as the subject of a negotiated contract, and requested the Public Procurement Service to purchase the slurg collection machine from L Co., Ltd. by means of a negotiated contract on May 11, 2012. Accordingly, the Public Procurement Service entered into a negotiated contract with L Co., Ltd. to purchase slurg collection machine at KRW 2.98 billion between May 30, 2012.

From February 20 to March 20, 2013, the Board of Audit and Inspection prepared on the N5th floor located in M on March 20, 2013, and the Board of Audit and Inspection was conducting an audit on the “actual status of construction and management of infrastructure in the Chungcheong area” by the Board of Audit and Inspection, and the Defendant, who is working for construction and work for E, was around 9:00 am on March 8, 2013.