(영문) 서울중앙지방법원 2016.02.02 2014가단255365
부동산인도등
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The entire management body of the building on land B and seven parcels (hereinafter “instant building”) in Jung-gu Seoul, Jung-gu, and the entire management body of the building is No. 1.

The 1, 2, and 5, and 6 floors underground of the instant building (hereinafter referred to as “the sub-lease object of this case”) were leased to the Stiti Co., Ltd. (hereinafter referred to as “Sti”)

(hereinafter referred to as the “instant integrated lease agreement”) a lease agreement with the entire management body of the instant building, which is a contract with the manager agency.

B. It is against the Defendant

Isti is a proposal under the instant integrated lease agreement on August 17, 2011.

The first contract was concluded on December 29, 201 with the content that the 1, 2, 5, and 6th underground of the instant building leased by Lee Sti shall be the prior settlement cycle to the Defendant, and the first contract was concluded on December 29, 201.

C. However, the management body of the instant building “each of the instant floors” was denied the instant integrated lease agreement with the third party, resulting in conflict between the entire management body of the instant building and the sectional owners of each of the instant floors, thereby promoting the conclusion of a lease agreement with the third party.

The defendant is the defendant

No. 14 December 14, 2012

When a problem arises in the implementation of the first contract due to the failure to perform the obligations of the pact, the terms and conditions of this contract were modified, and the second contract was newly concluded (hereinafter referred to as “the sub-lease contract of this case”).

The main contents of the sub-lease contract of this case are as follows.

Article 11 (Deposit, etc. for Sublease by Connection with Other Contracts) (1)

In addition to this sub-lease contract, the defendant agrees to enter into a lease agreement between all sectional owners on each floor or by each floor of the sub-lease object and a person delegated by the sectional owners on each floor.

2. In this case:

Isopti agrees to pay directly to the contractor by each floor as follows, the Defendant has agreed to pay the sub-lease deposit, the rent, and the general management expenses:

Esti shall be free.