logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 2014.10.16 2014고정2507
업무방해
Text

Defendants shall be punished by a fine of KRW 300,000.

If the Defendants did not pay the above fine, KRW 100,000.

Reasons

Punishment of the crime

The Defendants, as residents of the H building in Busan Northern-gu, considered that the construction work near the H building (the construction of the H building was decided to be built on an underground street other than the ground at the request of the residents, and the construction work should be prior to this purpose) would damage their residence, and formed the H Emergency Countermeasure Committee (the Defendant A confirmed the participation of the Defendants and residents at the construction site at the general affairs of the Defendant C, the Vice-Chairperson, and the residents at the construction site) composed of the Defendants and residents in the middle of May 2013, and came to hold that it would prevent the progress of the construction at the construction site at the construction site without following the procedures such as the suspension of construction, provisional disposition, etc., by entering the competent court.

1. On June 25, 2013, Defendants: (a) conspired with 40 residents in distress; (b) from June 25, 2013 to around 14:00 on June 25, 2013, at the Hatototo G in the vicinity of H building, Jin K is entering the construction site; (c) disregarding the signs “non-related persons other than those concerned during the construction site”; and (d) enter the construction site; and (c) Defendant A c, D, E, E, and B, together with the residents in distress, moved the building site into the access site; and (d) Defendant F interfered with the management of the victim’s on-site by preventing the use of equipment, such as ceiling air, etc., at the construction site.

2. On July 1, 2013, the Defendants conspired with 40 residents in non-name and entered the scene of the victim from July 1, 2013 to 17:10 on the same day from July 1, 2013, the victim of the victim from July 09:0 to 17:10 on the same day, he entered the construction site, “the prohibition of entry and exit other than the persons concerned during the construction work,” disregarding the signs “the prohibition of entry and exit other than the persons concerned during the construction work,” and Defendant A was under disturbance in the tent, and Defendant B was emitted on the tent screen

arrow