(영문) 의정부지방법원 2017.11.16 2016고정865
국토의계획및이용에관한법률위반등
Text

The defendant shall be exempted from punishment.

Reasons

Punishment of the crime

[Criminal record] On July 10, 2015, the Defendant was sentenced to one year and two months of imprisonment for fraud, etc. at the Jung-gu District Court on July 10, 2015 and the judgment became final and conclusive on October 15, 2015.

[2] Although the Defendant was intended to construct a house on the land of B and J, one of his wife C, the Defendant filed an application for permission to change the form and quality of the said land under the above C’s name at the Namyang-si around December 201, stating that the purpose of the permission is “the creation of a site for farmland” was “the creation of a site for farmland.” On January 31, 201, the Defendant was “the permission to change the form and quality of the land for the creation of a site for farmland” from the Namyang-si around January 3

1. Any person who intends to divert farmland in violation of Acts and subordinate statutes shall obtain permission from the Minister of Agriculture and Forestry for fisheries;

In order to “the creation of a site for building” on the above land, the Defendant installed a retaining wall with a height of approximately eight meters from October 4, 201 to February 2, 201, and a retaining wall with a structure of steel reinforced concrete structure (L-type retaining wall) of about 80 meters in length, and used the above farmland for other purposes without permission for diversion of farmland.

2. Any person who intends to erect a retaining wall or any other structure to create a site in violation of the Building Act shall report it to the competent authority;

Although the Defendant did not report for the installation of a structure, the Defendant installed a retaining wall of the reinforced concrete structure (L-type retaining wall) with a maximum height of about 8 meters and about 80 meters in length, as stated in the foregoing 1.

Summary of Evidence

1. Entry of the defendant in part in the first trial record;

1. Court rulings (No. 47 once a year);

1. Responses requesting cooperation in investigation;

1. Permission to engage in development activities (in the form and quality of land), review replies (No. 71 times a patrol time), and permission to engage in development activities (No. 72 times a patrol time);

1. A contract of general level of construction standards, terms and conditions for the performance of construction works, specifications, drawings, records of civil litigation, on-site photographs;

1. A certified copy of land registry (B), or a certified copy of land registry (J);

1. Previous convictions: inquiry of summary information of the case, and the judgment of the District Court 2013 order 2008.