Text
Defendant
A shall be punished by a fine for negligence of KRW 1,500,000, and by a fine of KRW 1,000,000.
The Defendants respectively.
Reasons
Punishment of the crime
Defendant
A as a tree on December 30, 209, around December 30, 2009, A entered into a subcontract for new construction works with C, a company (the representative director D, representative director E, hereinafter referred to as “C at the time”) which is an executory company, and entered into a contract for new construction works, which is between December 30, 2009 and January 30, 2010, and entered into a contract for new construction works, and received the price for supply from the victim after having supplied the said new construction works to the said company. The Defendant B was a person who operates the temporary materials supplier at the construction site with the trade name of “G,” and on January 12, 2010, the victim H Co.,, Ltd. (I, hereinafter referred to as “H”) who is a joint guarantor, a victim at the time of the said new construction works, under a lease contract between Defendant A and the said temporary owner and received the price for supply from the victim.
Defendant
A In performing the crypt construction work at the site of the above new construction works located in Gangnam-siJ, a cryp house made of poppy (hereinafter referred to as the 1st cryp mold, 10 tons truck) among the temporary materials (the 4th cryp mold) is ordered by Defendant A in accordance with the above lease contract. The cryp house made of the cryp from Defendant B by paying the price for the supply of the goods to the victim, and the cryp house made of the cryp and the cryp (hereinafter referred to as the 2nd cryp, 10 tons truck) is ordered by Defendant A, and the cryp house made of the cryp and the cryp set of the cryp (10 tons truck) from September 2009 to February 2, 2010 was purchased by the cryp in Seoul Special Metropolitan City.
Defendant
A In order to store materials, etc., including new materials, remaining after being used for construction at the site of the above new construction works on April 2010 in order to use them for the said new construction works, A shall be accumulated out of the dry field located in Gangseo-si N, which was leased by the victim before the time when the victim was transferred from M. In order to store materials for the said new construction works. Of the second new construction materials owned by the victim, “3 x 6 x 400 x 400 x 8 x 200 x 200 x 4 x 4 x 4 mba (referring to the mba x 26 and 2 x 4 mba), approximately 300 maba (hereinafter referred to as the mbags, mags, respective parts, etc.)”