(영문) 서울중앙지방법원 2016.04.19 2014가합26144
손해배상(기)
Text

1. The Defendant’s KRW 154,720,870 for the Plaintiff and 5% per annum from September 29, 2013 to April 19, 2016.

Reasons

1. Basic facts

A. The construction process of the instant case 1) The Slim Electric Power Co., Ltd. (hereinafter “Slim Electric Power”).

2) The corporation and the corporation Benex (hereinafter referred to as “Benex”)

) On September 2013, the Elementary and Secondary School of the Ansan Line (hereinafter referred to as the “instant school”).

(2) A contract for the replacement of high voltage electric power distribution teams in (hereinafter referred to as the “instant construction”) was made.

(2) In order to perform the work of separating the cables of high voltage and low voltage lines from the power distribution team in cooperation with the Defendant’s female COS location (COS), tax performed the work of separating the cables of high voltage and low voltage lines from the power distribution team. After that, on September 27, 2013, tax performed the work of replacing the water distribution team on the water distribution team, which was divided into two separate lines on September 28, 2013, and completed the inspection of use after performing the work of connecting the wire cables of high voltage lines, which was separated from September 28, 2013.

B. On September 29, 2013, the Plaintiff, an electrical construction engineer, who belongs to the instant plant, carried out the instant work and the instant accident, carried out the electric cable connection work of the low voltage line, which was separated from the low voltage line under the short power line. 2) After the Plaintiff’s completion of the said work, the Plaintiff entered the high voltage line area to check the high voltage cable cable on the ground, and, for the Plaintiff’s safety, the Defendant Company B, who is affiliated with the Defendant, called “B, putting electricity into the high voltage line for the high voltage line inspection,” saying, “B,” who is affiliated with the Defendant, puts the phone to the high voltage line, and put it into the high voltage line for the high voltage line inspection.”

3) However, the Defendant-affiliated D, who was at the site, sent C’s telephone call form and sent C instructions to supply electricity to C, and C supplied electricity according to D’s instructions. 4) The Plaintiff was reduced due to the above electricity supply, and accordingly, the face, neck, body body, sprink, kh hand, etc.

arrow