(영문) 대구지방법원 2015.04.30 2014고단6001

업무방해

Text

Defendant shall be punished by a fine of KRW 5,000,000.

When the defendant does not pay the above fine, 100,000 won.

Reasons

Punishment of the crime

On January 7, 2009, the Korea Electric Power Corporation commenced construction of transmission line lines in order to supply the power of the power of the power of the power of the power station located in the Sungsan-gun to the Daegu Power Station and the senior Power Station, and completed construction (basic, assembly, and inter-line construction) with the exception of the 23 nuclear power station located in the North Cheong-do, Cheong-do, North Cheong-do, in the total of 40 transmission towers.

On the other hand, Cheongdo residents and external organizations, such as the Cheongdo-si residents and the Daegu Environmental Campaign Association, interfered with the construction of the 23th period transmission tower located in the Cheonggu-ri-si, and the construction was suspended from July 3, 2012. On March 7, 2013, 222 organizations, such as Green Party and the Daegu Environmental Campaign Association, jointly and severally formed the Cheongdo-345 V Joint Measures Committee against the Cheongdo-dong 345 V (hereinafter “Public Subrogation”), and on April 26, 2013, residents continued to act against the construction and assembly or demonstration by organizing the “The Committee against the Exclusion of the Samgu-ri Power Transmission Team”.

On October 8, 2013, the Republic of Korea filed an application with the Daegu District Court for the injunction against obstruction of construction against the opposite residents and the outside power 23 persons, and the said provisional injunction was accepted on March 20, 2014, the construction resumed from July 21, 2014.

The defendant is the head of the democratic labor union D's headquarters, who participated in the demonstration against the transmission tower by Cheongdo-do.

From 05:00 on July 21, 2014, Korean power installed fences around the construction site for the purpose of preventing any accident that may occur in the course of collision and construction with opposite forces, from the construction site of the transmission tower at the site of Han-ri, 432-2 located in each North Cheong-do, Cheong-do, Chungcheongnam-do.

Accordingly, the Defendant, in collusion with opposing forces, such as E and F, was at the construction site at around 07:40 on the same day, and in order to interfere with construction, the Defendant entered the construction site to prevent Han electric power personnel from entering the construction site, and take a bath to the Han electric power personnel to prevent them from entering the construction site, and attached the Han electric power personnel, and E shall remain within the construction site.