구상금
1. The Defendants jointly share KRW 80,505,945 with respect to the Plaintiff and the period from March 1, 2017 to August 16, 2018.
Basic Facts
1) The Plaintiff between B and B around November 15, 2013, as well as the building C of the Nam-gu Incheon Metropolitan City (hereinafter “instant building”) owned by B.
As to the insured B, the insurance period from November 15, 2013 to November 15, 2016, the fire insurance amount of KRW 500,000,000,000,000,000,000,000,000,000,000.
B) On July 18, 2016, between D and D, the building E and F companies owned by D (hereinafter “the building adjacent to this case”).
(2) As to the insured, the fire insurance contract (hereinafter “B insurance contract”) with the total sum of KRW 1.05 billion from July 19, 2016 to July 19, 2017, with respect to the insured period D and the insurance amount as from July 19, 2016 to the aggregate of KRW 1.05 billion.
(2) The Defendant Hyundai Marine Fire Insurance Co., Ltd. (hereinafter “Defendant Co., Ltd.”) concluded a fire insurance contract with Defendant A with respect to the part on the first floor of the instant building leased and occupied by Defendant A (hereinafter “instant leased part”) from August 21, 2015 to August 21, 2020, with the insurance coverage amounting to KRW 50 million, and the amount of fire liability security amount as KRW 300 million.
(hereinafter “III Insurance Contract”) around August 23, 2016, around 23:09, fire occurred in the leased premises of this case, and the building and internal materials of this case were destroyed, and the walls of the sandd Location Panel were destroyed and damaged.
(hereinafter “the instant fire”). In relation to the instant fire, the fire station of the Incheon Industrial Complex appears to have been burned out at the time of arrival at the fire site due to a fire, and there was no possibility of fire due to fire possibility, human corrosion, mechanical factors, chemical factors, gas leakage, etc., but there was a high possibility of the outbreak due to electrical factors on the ground that in the leased part of the instant fire, it was identified in the air conditioners, electric power supply lines, and multi-Contacs in the instant leased part.