beta
(영문) 서울중앙지방법원 2018.11.29 2017가합548140

물품대금

Text

1. The Defendant shall pay to the Plaintiff KRW 258,35,00 and the interest rate of KRW 15% per annum from July 27, 2017 to the day of full payment.

Reasons

4. References: References to written estimates. (5) From November 2016 to November 2017;

3. The payment terms and conditions for ① Do gold: One gold (2) Do gold: one 2.0 million won per n.e., one n.e., one n., one n.e., one n.e., one n. one n. one n. one n. two (206,668,00): one n.e., one n. one n. two-seven (51,667,00 n.e., one n. one n. one n. one n. one n. two (50%) per n.e., one n. one n. one n. two hundred and sixty (50%) per n.e., one n. one n. one n. one n. two (50%) from the first n. the other n.e. one n. two to the fourth n.

순번 품명 규격 수량 단위 단가 금액 비고 A E 600*600 1,365,00 M2 18,000 24,570,000 530*600 10.08 M2 25,000 252,000 450*600 133.92 M2 28,000 3,749,760 1면모서리커팅 20.16. M2 20,000 403,200 2면모서리커팅 76.32 M2 22,000 1,679,040 4면모서리커팅 53.28 M2 26,000 1,385,280 (중략) Z F 분양타일 63.00 M2 50,000 3,150,000 AA G 600*800 139.68 M2 15,000 2,095,200 1 H 디딤판 300*600 1,026.72 M2 26,000 26,694,720 8 가공비 5,704,00 징 5,000 26,520,000 2 H 챌판 200*600 685.44 M2 26,000 17,821,440 8 가공비 5,712.00 장 800 4,569,600 3 H 600*600 596.16 M2 26,000 15,500,160 (중략) 합계 258,335,484

B. According to the instant supply contract, the Plaintiff imported the Defendant with a different delivery date and processed the female hosting, etc., and stored the processed date in a warehouse on December 10, 2016, and completed the preparation to deliver the other date to the Defendant.

다. 그런데 피고의 자금 사정으로 인하여 2016. 12.경부터 2017. 3.경까지 D 공사가 거의 중단되다시피 하였고, 그로 인해 원고는 피고에게의 타일 납품을 미루고 있었는데, 2017. 6. 6.경 피고의 요구에 따라 위 견적서상 순번 1, 2, 3항 기재 타일(H 디딤판, H 챌판, H) 샘플을 갖다주었으나, 피고는 위 타일은 당초 피고가 요구했던 타일이 아니라는 이유로 그 납품을 거절하였다. 라....