(영문) 제주지방법원 2019.01.11 2013고단989

업무방해등

Text

The defendant shall be innocent.

Reasons

1. On April 12, 2013, the facts charged, around 14:38, 2013, the victim E, a subcontractor, was working for the production of triang block on the part of the victim D, a contractor, at the site of C Construction Work in Seopo-si B, Seopo-si, Seopo-si, 2013, and a construction vehicle, such as ready-mixed, intended to enter the construction site for concrete removal necessary for work.

At this time, the Defendant, together with F, G, H, I, J, etc. from that time to 14:46 of the same day, had been in the entrance of the C&C Construction Project Agency for eight minutes from that time, and obstructed the construction vehicles from leaving the construction site to that of the construction site.

As a result, the Defendant, in collaboration with F, made it difficult for F to operate construction vehicles such as 8-minuted vehicles by force, thereby interfering with the construction work of the victim D Co., Ltd. and the victim E Co., Ltd., a subcontractor.

around October 10, 2014, the CConstruction Project Association stated the total area of 1,880,760 square meters in Seopo-si, K, L, M on a site of 9,407 square meters owned by the Ministry of National Defense, which is a land owned by the Ministry of National Defense, and the bill of indictment "1,880,760 square meters" in the bill of indictment, but it appears that it is a clerical error.

In the total construction cost of KRW 7.34 million, five buildings with a scale of 4th floor above ground and 72 households planned new construction and started construction.

However, around October 25, 2014, the PPP level, etc. where the O-villages, etc., opposing the C Construction, installed without permission one from Mongoliancheon-si in the front of the entrance of the construction site and Qgu, which is part of the construction site, and one from the front of the construction site, to occupy the said site and road, and occupied the said site and road, and interfere with construction by preventing the passage of trucks entering and departing from the construction site for construction works.

Accordingly, the Minister of National Defense on January 27, 2015 to two persons, such as Qu S, etc., belonging to the C&D on January 27, 2015, and according to the State Property Act and the Administrative Vicarious Execution Act, the Mongoliancheon and the compact cars installed in the above construction site.