전기사업(태양광발전)불허가처분 취소
1. The defendant's appeal is dismissed.
2. The costs of appeal shall be borne by the Defendant.
Purport of claim and appeal
1..
1. Details of the disposition;
A. The Plaintiffs filed an application with the Defendant for the electric utility license with the following specifications:
(이하 '이 사건 각 신청‘이라고 한다). 원고 신청일 신청내용 사업 종류 신청부지 전기사업용 전기설비에 관한 사항 사업 준비 기간 A 2016. 08. 26. 태양광 발전 전남 진도군 M, N (토지 : 1,300㎡, 99kW) 원동력의 종류 : 태양광발전 주파수 : 60Hz 공급전압 : 3φ4W 380V/220V 설비용량 : 99kWp 36개월 B 상동 ″ 위 M (토지 : 1,413㎡, 99kW) ″ ″ C 상동 ″ 위 M, N (토지 : 1,356㎡, 99kW) ″ ″ D 2016. 09. 22. ″ 위 M, N, O (토지 : 1,327㎡, 99kW) ″ ″ E 상동 ″ 위 N, O (토지 : 1,309㎡, 99kW) ″ ″ F 상동 ″ 위 N, O, P, Q (토지 : 1,478㎡, 99kW) ″ ″ G 상동 ″ 위 O, P, Q (토지 : 1,632㎡, 99kW) ″ ″ H 상동 ″ 위 R (토지 : 1,644㎡, 99kW) ″ ″ I 상동 ″ 위 S, R (토지 : 1,650㎡, 99kW) ″ ″ J 상동 ″ 위 T, U, V, W (토지 : 1,650㎡, 99kW) ″ ″ K 상동 ″ 위 U, V (토지 : 1,650㎡, 99kW) ″ ″ L 상동 ″ 위 X, T, W (토지 : 1,674㎡, 99kW) 원동력의 종류 : 태양광발전 주파수 : 60Hz 공급전압 : 3φ4W 380V/220V 설비용량 : 98.8kWp ″
B. On November 7, 2016, the Defendant entered the Plaintiffs into the Defendant’s written disposition under Article 7(1)1 of the Guidelines for Operation of the Permission for Development Activities of Jindo-gun (hereinafter “instant Guidelines”), but this appears to be a clerical error in subparagraph 1 (see Evidence A, 13, 14), which was located within 200 meters in a straight line from the main roads in accordance with Article 7(1)1 of the Jindo-gun’s Guidelines for Operation of the Permission for Development Activities (hereinafter “instant Guidelines”), and notified the Plaintiffs of non-permission regarding each of the instant applications on the ground that they were located within 20 meters in a straight line (hereinafter “instant dispositions”).
C. On September 2016, the Defendant issued the instant guidelines to Jindo-gun Directive No. 405, and came into force from October 4, 2016.
[Reasons for Recognition] There is no dispute, and each entry number of Gap evidence 1 to 14.