건축법위반등
Defendant shall be punished by a fine of KRW 2,000,000.
When the defendant does not pay the above fine, 100,000 won.
Punishment of the crime
1. Where a project owner intends to change any building permit, he/she shall obtain permission from the permitting authority before such change is made, and where he/she changes any permitted matter, he/she shall obtain permission from the competent authority
The Defendant did not obtain permission to change the location of a building to a degree of 10 meters different from the permitted matters while constructing a building with permission to construct a building or permission to engage in development activities from the 451.5 square meters of rice market in Seosan-si, Seosan-si to the end of January 2013, 2012.
2. If a project owner intends to change any building permit, he/she shall obtain permission from the permitting authority before such change is made;
On March 3, 2011, the Defendant: (a) constructed a building with a building permit from the rice market in the E and 10 lots outside Seosan-si from June 201 to January 2013; (b) instead of the matters permitted from around June 2012, the Defendant: (c) instead of the matters permitted from around 3, 201, 26.40 square meters; (d) 60.54 square meters of toilets; (e) 36 square meters of toilets, temporary storage; (e) 129.36 square meters, 65.00 square meters, 59.00 square meters; and (e) 47.61 square meters of a shower room; and (e) (e) (e) (i) (i) (i) (i) (i) (ii) (iii) (i) (i) (i) (i) (iii) (i) (i) (i) (i) (ii) (iii) (i) (i) (ii) (iii) (i) (i) (i) (ii) (ii) (iii) (i) (i) (ii) (iii) (ii) (i) (iii) (ii) (iii) (ii) (iii) (iii) (i) (except)) (iii) (iii)) (iii) (iii) (iii))))) (i (except (except (except)) (ii)))))) (iii) (i.