채무부존재확인
1. All of the claims in this case shall be dismissed.
2. A project of tools (Gumi-gu) 28 tools (Gumi-gu) for the Nakdong River;
(3) If it is possible to find it possible to modify a bill of lading accurately compared with design drawings, etc. at the time of tender - new item: the increased quantity: the contract unit price - the amount calculated at the time of tender - the amount to be issued at the time of tender - the amount to be perused, such as disagreements between drawings and bill of materials, etc. - the increased quantity: the increased quantity: the unit price at the time of design change x the consultation rate - new item: the rate of consultation x the consultation rate at the time of design change x the consultation rate) the settlement of the amount ordinarily generated at the scene of civil works - the increased quantity: the increased quantity: the new cost of contract - the increased quantity at the time of design change - (3) the consultation rate at the time of design change x the new cost of construction - the consultation rate x the consultation rate x the consultation rate x the number of new cost of construction 2. The increase or decrease in the total project cost by the head of the Regional Construction and Management Administration within 30-month Construction and Management Guidelines, etc.