beta
(영문) 대구지방법원 서부지원 2018.08.16 2017가단12350

토지인도등

Text

1. The Defendant shall, in order to the Plaintiff, each point indicated in the attached Form 1 through 17, and 1 among the area of 430 square meters in Gyeong-gun, Seongbuk-gun, Seongbuk-do.

Reasons

1. Facts of recognition;

A. On June 23, 2016, the Plaintiff is a building owner of a building with a 430 square meters wide-area in Seongbuk-gun, Seongbuk-gun, Sung-gun, and ordered the Defendant to perform the structural construction of the above building.

B. While performing the above structural construction, the Defendant waived the construction, and there remain spawres, copper, and rain pipes as stated in the order installed by the Defendant at the construction site.

[Ground of recognition] A without dispute, entry of evidence No. 1, purport of the whole pleadings

2. According to the above facts of recognition, the defendant is obligated to collect each of the diversities, dongba, and non-form pipes as indicated in the disposition and deliver the building and land as indicated in the order to the plaintiff.

Therefore, the plaintiff's claim is reasonable, and it is decided as per Disposition.