beta
(영문) 제주지방법원 2019.12.18 2018구합6021

입찰참가자격제한처분취소

Text

1. The Defendant’s disposition of restricting participation in bidding against the Plaintiff on November 19, 2018 is revoked.

2. The costs of lawsuit shall be.

Reasons

1. Basic facts

A. 1) The Plaintiff is a company established for the purpose of manufacturing water supply and sewerage systems, such as gaseous and filtering machines, and the construction business of water supply and sewerage systems. 2) The Defendant is the head of the “B” agency established for the efficient implementation of the C business pursuant to Article 44(1) of the Special Act on the Establishment of Jeju Special Self-Governing Province and the Development of Free International City, and Articles 2 and 42 of the Ordinance on the Establishment of

B. On June 2015, the Plaintiff: (a) had contact with the air flowing through the air exhaust pipe (e.g., the air exhauster) through the air exhaust pipe (e., the air exhauster) through the air exhaust pipe (e.g., the air exhauster and ventilation pipe for air or gas; hereinafter “the air exhauster”) from the outside of the instant procurement commodities; and (b) had contact the air flowing through the air exhaust pipe (e.g., the air exhauster) with the air exhauster (e., the air exhauster); and (c) has removed the air exhauster from the air exhauster through the air exhauster (e.g., the air exhauster).

The Plaintiff participated in the purchase bid by the E institution regarding the “production and installation” (hereinafter “instant construction”) and was selected as a successful bidder. Accordingly, on June 17, 2015, the Plaintiff entered into a contract with the following contents. After the two times, the said contract was modified on June 28, 2016 (hereinafter “instant contract”), and the delivery period was modified by June 28, 2016 (hereinafter “instant contract”).

2) Ordering Agency: After the F institution’s amendment of the former Ordinance on the Establishment of Jeju Special Self-Governing Province’s Administrative Organization on June 7, 2016, its name was changed to “B institution.” The name and quantity: 364,80,000 won supply period: January 13, 2016: G Co., Ltd. (hereinafter “G”) (hereinafter “G”) (the supervising entity of the instant construction) was the Plaintiff on two occasions on December 17, 2015 and January 13, 2016.