특수절도등
A defendant shall be punished by imprisonment for one year.
Seized evidence 1 to 5 shall be confiscated.
Punishment of the crime
1. Around March 12, 2010, the Defendant attempted to larceny at night buildings from around 22:00 to around 02:00 on March 13, 2010, upon intrusion beyond the fence of “E” managed by the victim D located in Gwangju Mine-gu C, and cut off the unexponed electric wires at the market price at the external voltages of the factory, and attempted to load them into the cargo from the Frier, on which the Defendant was aboard. However, the Defendant attempted to detect the Defendant, and attempted to flee, as they were, on the wind coming from the wind of having driven.
Accordingly, the defendant attempted to steals property by impairing the victim's structure at night.
2. From July 11, 2015 to July 11, 2015, the Defendant of special larceny: (a) opened and intruded into an open door of an I factory acquired by the victim H in Gunsan-si from July 22, 2015 to July 02:0, 2015 by an auction; (b) cut off two joint wires connected from the outer voltage of the factory to the inner power distribution team; (c) cut off the windows by cutting them into the factory; and (d) cut them by cutting them with hand.
Since then, the Defendant cut the locks with a locker, and re-entered the electric wires set up prior to the moving into the factory door, using the “floring,” and deducted them from getting off by driving the said wires, using the “floring,” and then, the Defendant carried the cut wires with two set wires and plicated wires equivalent to eight million won at the market price of the victim’s possession.
Accordingly, the defendant stolen property by destroying and damaging part of the victim's structure at night.
3. On December 28, 2015, the Defendant: (a) opened a locked door of the victim limited liability company M& factories managed by L from 22:00 on December 28, 2015 to 02:00 on December 29, 2015; and (b) was connected to the internal power distribution teams from the outer pressure gauge of the factory to the inner power distribution teams.