(영문) 광주고등법원(전주) 2015.11.23 2015누108

폐기물처리사업계획서 부적정통보처분 취소

Text

1. The plaintiff's appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

Purport of claim and appeal

The first instance court.

Reasons

1. Details of the disposition;

A. On February 14, 201, the name of the Plaintiff was changed to the Saemangeum Regional Environmental Office on July 26, 2012, the Jeonju Regional Environmental Office, the head of the Jeonju Regional Environmental Office.

The head of the former regional environmental office before the change for convenience shall also be entered as the defendant.

Around March 23, 2011, a waste treatment business plan was submitted to operate a final waste treatment business (hereinafter “instant business”) in the 262 Simdo-ri, Jinan-gun, Jinandong-gun (hereinafter “instant project site”), but voluntarily withdrawn the project on the grounds of the opposite civil petition and location of neighboring residents. On November 8, 2011, a new waste treatment business plan was submitted to the Defendant (hereinafter “instant business plan”).

B. The main contents of the instant business plan are as follows.

The category of business: Wastes subject to final disposal of controlled wastes: Error (the content of waste generated from a specific facility is less than 95%, the content of solid substance is not less than 5%, wastewater treatment sewage, process sludge), waste synthetic high compound compound - Hazardous substance content wastes (designated wastes as specified in attached Table 1 related to Article 3 of the Enforcement Decree of the Wastes Control Act): Lighting materials, dust dust, waste dust, waste kitchen and sandbbbrst waste disposal company, waste cargo, waste bombbblorgs, waste fluorum, waste acid, waste acid, waste acid, waste acid, waste boom, waste absorption, waste absorption, waste absorption, and waste absorption - Other matters: Details of installation of facilities and equipment installed in the surrounding environment: 47,460 square meters in roof-type structures (the capacity of the landfill facilities): average area of reclaimed facilities for at least 230,240 square meters in 20,000 square meters in 20,000 square meters in cubic meters: 230,242525 metres meters in cubic meters.

C. On January 11, 2012, the Defendant issued the instant business plan to the Plaintiff for the following reasons.