산업안전보건법위반
Defendant
A shall be punished by a fine for negligence of KRW 6,000,000, and by a fine of KRW 3,000,000.
Defendant
A above.
Punishment of the crime
1. Defendant A
A. The Defendant in violation of the Occupational Safety and Health Act is a person who acts on behalf of a business owner as a site manager at the E Park Creation Work site located in D in the original city, the main office of which is located in the Chuncheon City C building.
The business owner shall install protective measures, such as a rail, at a place where workers might fall down, and shall take measures necessary for the prevention of danger, such as the installation of proper slot equipment or posting monitors, if the business owner projectes an object from a place where height is at least three meters.
Nevertheless, at around 13:40 on September 10, 2013, the Defendant, at the above construction site, engaged in the work of a worker F to get a combined plate down at the level below 3 meters from the excavated site, and did not take a fall preventive measure and did not install a cooling system, thereby falling the said F at a level below 3 meters from the crop and falling the head into a concrete pipe, thereby causing the death of around 14:30 on September 14, 2013.
B. The defendant by occupational negligence is above the above Ga.
As described in Paragraph B, as the site manager at the construction site of the E Park Construction site at the construction site of the company B, there was a duty of care to prevent accidents by taking necessary measures, such as installing a rail at the place where workers might fall, and by taking necessary measures, such as installing a proper slot system or posting a supervisor, when projected an object from a place where the height is at least three meters.
Nevertheless, the defendant above A.
On the date and at the place stated in the port, the victim F (73 years of age) did not take the necessary measures to prevent the fall and did not install a fall-off system, thereby falling down with the head on the concrete pipe, resulting in the victim's death at around 14:30 on September 10, 2013.
2. Defendant B, a stock company, is in building C in Chuncheon City.