beta
(영문) 창원지방법원 통영지원 2015.07.22 2014고단1169

사기등

Text

The defendant is not guilty, and the summary of the judgment of innocence is publicly notified.

Reasons

1. The summary of the facts charged is that the Defendant is the representative director of D (ju) for the purpose of manufacturing business, etc. in the Vietnam-si. E is a person who exercises overall control over the supply of chemical power plants to the deputy head of the (ju)G for manufacturing business, etc. from the Pakistan-si F.

Around September 5, 2012, the Defendant entered into a contract with the Chancheon Power Headquarters of the Victim's South-dong Development Republic of Korea with the “H” (hereinafter referred to as the “P”), according to the said contract, the materials and physical properties (physical properties) prosecutor of the Czemix shall comply with the test results of the relevant authorized institution, and submit the test results, etc. of the authorized institution at the time of supply

(A) On September 28, 2012, the Defendant provided a subcontract to the G for the mixing of the consortiums manufactured under the above contract, on or around October 12, 2012, which is a part of the purchase standard contract, (i) the purchase specifications, (ii) the items of the “test and inspection”, and (iii) the documents to be submitted. On or around September 28, 2012, the Defendant provided a subcontract to the G, and (iv) the Vice Minister of G completed the mixinging work for the above pooling, but there is no time to request the Korea Institute of Engineering and Technology to conduct a test for the mixing, and (v) the Defendant was unable to obtain the test report by the due date, and the Defendant provided that E request the Defendant to forge the date of issuance of the test report already issued.

Thus, E, using the test report in the name of the President of the Korea Institute of Engineering and Technology, which was already issued by the said G office around October 12, 2012 and was kept in a computer, on May 8, 2012, by means of the test report in the name of the President of the Korea Institute of Engineering and Technology, “the 25th day of September 2012,” “the 2012 from September 25 to September 28, 2012,” “the 2012 from September 28, 2012,” and “the 201st day of September 29 to September 28, 2012,” and “the 201st day of May 8, 2012,” written as above, “the 205th day of September 25, 2012,” and “the 201st day of February 29, 2012,” written as above.