벌점부과처분 취소
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
1. Details of the disposition;
A. The Plaintiff is a corporation that engages in the design, supervision, and supervision service of buildings.
B. On September 26, 2011, the Plaintiff entered into a construction supervision agreement with B on the instant apartment house construction project (hereinafter “instant construction project”) with B (hereinafter “B”), and performed the supervision service from October 201 to August 25, 2014.
C. On August 2017, the Seo-gu Office of Daejeon Metropolitan City conducted a field investigation on the instant construction project as a civil petition related to the instant construction project occurred.
On March 22, 2018, the Defendant: Article 53 of the Construction Technology Promotion Act; Article 87(5) [Attachment 8] 5(b) of the Enforcement Decree of the Construction Technology Promotion Act for the following reasons.
Pursuant to the item, the disposition imposing four points of penalty points (hereinafter referred to as the "disposition of this case") was made.
The plaintiff, who entered into a construction supervision contract with a business entity in relation to the instant construction project, finds any violation of the customary law, such as the Regulations on Standards, etc. of Housing Construction, or if the construction contractor fails to perform construction works in accordance with the design documents while conducting supervision, he/she shall immediately request the correction or reconstruction; however, he/she shall be negligent in taking measures such as ordering the correction if he/she violates the provisions of the Regulations on Standards, etc. of Housing Construction and the Building Act; Provided, That the imposition of fraudulent penalty points: (a) the imposition of penalty points: (b) the examination of the design documents and the plans for installing the fireproof structure walls or Class A fire doors in the stairs room of the penalty points, the number of penalty points, the speed prevention level, and escape stairs; and (c) the examination of the design documents and the violation of the relevant Acts and subordinate statutes; and (d) the direction of correction if the construction works are violated (hereinafter