(영문) 서울중앙지방법원 2016.05.11 2015가단210604
대여금
Text
1. The Defendants are jointly and severally and severally liable to the Plaintiff for KRW 30,477,405,981 and KRW 14,99,929,907.
Reasons
1. The description of the grounds for the claim shall be as specified in the attached Form;
(However, the creditor's "creditor" is "Plaintiff", "debtor" is "Defendant", and the lawsuit was withdrawn against the defendant Ssung Integrated Construction Co., Ltd. and the defendant Hyundai Cement Co., Ltd.