(영문) 서울동부지방법원 2016.07.05 2015가단45858
건물명도 등
Text
1. The defendant is against the plaintiffs:
(a) deliver the buildings listed in the separate sheet;
(b)payment of 27,836,800 won and c.
Reasons
1. The description of the grounds for the claim shall be as specified in the attached Form;
(A) A conciliation was made between the plaintiff and the co-defendant Construction Co., Ltd. and the Dosan Comprehensive Construction Co., Ltd.)
참조조문