beta
(영문) 광주지방법원 해남지원 2014.11.19 2014고단216

업무상과실치사등

Text

1. Defendant A shall be punished by imprisonment with prison labor for one year.

However, the above sentence shall be executed for two years from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

Defendant

E Co., Ltd. (hereinafter referred to as “E”) is a corporation established for the purpose of the construction business at Ha, Jeondo-gun, Jeonnamdo-gun, and performed the construction of J facilities from Hado-gun, Jeonnam-do-gun, and Defendant C Co., Ltd. (hereinafter referred to as “C”) was the above E’s representative director, and Defendant C Co., Ltd. (hereinafter referred to as “C”) was a corporation established at K, Jeonnam-do-gun, for the purpose of the construction business, under the subcontract of tin work (hereinafter referred to as “instant tin work”) among the construction of J facilities at the above I Daily-gun, and Defendant B was the actual representative of the above C, and Defendant A was the owner of L, the 19 ton ship owner, who is the 19 ton ship owner, and was commissioned by C to transport the tin necessary for the instant construction from the above L.

1. Defendant A

(a) A person who intends to operate construction machinery violating the Construction Machinery Management Act shall obtain a construction machinery operator's license from the head of a Si/Gun/Gu

Nevertheless, the Defendant, without obtaining a construction operator’s license from the head of Shido Gun on April 10, 2013, operated a 29.9 ton Nps at the ero-ray in the ero-ray of Jynam-do from around 10:0 on April 10, 2013 to around 11:00 on April 10, 2013.

B. At around 09:00 on April 10, 2013, the Defendant, occupationally killed, etc.: (a) fixed the line for the divers area of the diverse of the above M diverse, after the Defendant was at a place to fix the diverse line, which is the wire line, in order to prevent any other change after having a barge loaded with 500 square meters in 50 square meters of sives from L, at the place of landing, at the place of the siverse line located in the siverse of the siverse of the siverse-gun, Gonam-do.

At around 10:00 on the same day, the Defendant himself is likely to walk on the floor when sled water has been cut and the power has occurred in the candle line with a sled water while working for loading and unloading sled water at the above bed.