beta
(영문) 서울고등법원 2015.05.08 2014나2041085

사용료

Text

1. The plaintiff's appeal is all dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

The purport of the claim and appeal is the purport of the appeal.

Reasons

1. The following facts do not conflict between the parties, or may be acknowledged by taking account of the whole purport of the pleadings as a whole in the entries in Gap evidence 1, Gap evidence 2, Gap evidence 9-1 to 6, and Gap evidence 10:

The Plaintiff is a business owner who engages in material and marketing leasing business in the name of “H”, and the Defendants are the project owner who newly built multi-family houses (hereinafter “instant house”) in the original city as indicated in the following table:

The building area of the Defendant at the place No. 1 B 1 B , J 327 2C 2C , Won-si, K 329 Da 329 Da 327 Da 4 E , Won-si, M 329 Doz. 5 F 5 Doz. N327 Guwon-si 6 G Doz.

B. On September 2012, the Defendants entered into a contract with P on a contract with P on a mold and steel reinforced construction among the new construction works of the instant housing (hereinafter “instant construction contract”). The main content of the instant construction contract is as follows.

O The name of construction: The date of the commencement of the O on October 4, 2012 of the new construction of the I multi-family house in the original city, which is the type mold and the construction of the steel bars (materials and History): The date of completion of the O on October 4, 2012: the details of theO on February 4, 2013: approximately 200 square meters per one unit, approximately 1,200 square meters per six units, respectively.

-The cost of the temporary materials shall be paid directly by the owner and deducted from the construction cost.

C. On October 16, 2012, the Plaintiff entered into a contract with P to lease temporary materials for the construction of the instant housing (hereinafter “instant lease contract”). The main contents of the instant lease contract are as follows. Defendant B, on behalf of the Defendants, entered his name, resident registration number, address, and contact information in the column of joint and several sureties of the instant lease contract.

O Name: A type mold for building (a board, building brate, or building works, or a temporary material that plays a role as a team, wood, or bed in civil engineering works; o.b. alley).